For stainless steel piston rods, if you want to package them, then we should naturally tie them up first. We should also ensure that they are clean and there will be no dirt. In addition, we usually put them in the warehouse for storage, which plays a big role in our use and operation. I don't know how everyone views and uses stainless steel piston rods. Of course, there are actually many ways to package stainless steel piston rods. If we can master them well, it will inevitably play a big role in our overall operation.
What are the steps for detecting the vibration of one hundred piston rods?
1. In a stroke of the reciprocating motion of the piston, check the horizontal and vertical radial vibrations of the piston rods at all levels to check the comprehensive maintenance effect of the motion mechanism.
2. Measure the vertical runout: The dial is precisely installed at the 12 o'clock position on the top of the piston rod, close to the sealing packing, and the pointer on the dial must be perpendicular to the piston rod body. Measurement of vertical runout: The dial is set at the 3 o'clock or 9 o'clock position of the piston rod, in close contact with the packing, depending on the closest "close distance" as possible.
3. The connection between the plunger rod and the crosshead must be opened correctly, and the crosshead must be flat and evenly attached to the slide rail. The gap between the slider and the slideway cannot be inserted at 6 o'clock. 0.04 mm, and the gaps between the four corner gap gauges inserted into the slideway must be consistent.
4. Press the "handle" of the dial, and the pointer on the dial will rotate on the dial surface so that the pointer faces the zero mark on the dial surface.